Choose one representative project
Before moving a whole workspace, choose a small project containing the things your team really uses: text, attachments, comments, dates and links between records. Write down what must survive the move. A demo project with one plain note can hide the parts of an export that matter most.
Inspect files outside the original app
Open the exported files with a suitable independent viewer. Check whether attachment names match the records, whether dates include enough context and whether text is readable. A ZIP file existing on your device proves only that a file was created. It does not prove the archive contains a complete or usable copy of the workspace.
Test the import without deleting the source
Use a test destination or a clearly separated project if the receiving service supports it. Compare record counts and inspect several complicated examples. Import success can still leave comments, permissions or linked records behind. Keep the old system available until an owner has accepted the result and retention requirements are understood.
Record the limits before committing
Write which features transferred, which did not and what manual work remains. Review current plan limits and export documentation for both products rather than assuming all tools share the same formats. This is a migration checklist, not a hands-on test or endorsement of a specific listed product. Never paste private customer data into a trial merely to test a format.